Skip to end of metadata
Go to start of metadata
You are viewing an old version of this content. View the current version.
Compare with Current
View Version History
« Previous
Version 29
Next »

A special feature at the time the building was built was a ventilation system to purify the air as it was drawn out of the chemistry labs. When Life Sciences Complex was completed in 2008, an atrium was added to connect the two buildings.