Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
CST_Exterior

A special feature at the time the building was built was a ventilation system to purify the air as it was drawn out of the chemistry labs. When Life Sciences Complex was completed in 2008, an atrium was added to connect the two buildings.

Panel
bgColor#FFBDAD#FFEBE6

CST 4-201

CST 4-201 Teacher PanoramaImage Removed

CST 4-201 Teacher PanoramaImage Added

Panel
bgColor#FFEBE6

CST 2-205

CST 2-205 Student 7200x2880px.jpgImage Added