Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Panel
borderStylenone




A special feature at the time the building was built was a ventilation system to purify the air as it was drawn out of the chemistry labs. When Life Sciences Complex was completed in 2008, an atrium was added to connect the two buildings.

Panel
borderColor#ed712b
bgColor#d9d9d9
borderWidth0
titleBGColor#ed712b
borderStylesolid

CST 1-019

Panorama of CST 1-019